Reston Square 2nd and 3rd Floor Demising and Stair Close In
Reston, VA
Two floor demising and stair close in located in Reston, VA
Reston, VA
Two floor demising and stair close in located in Reston, VA
Chantilly, VA
Project consists of the renovation of over 4,000 sf of tenant space including over 1,000 sf of site work for the drive-thru. Scope of work to include, but not be limited to, the following trades; demolition, site concrete, fencing, asphalt paving, Irrigation, concrete, masonry, steel & misc. metal, millwork, solid surface material, roofing (standing seam metal roof), doors/frames/hardware, OH doors, slimline glass system, glass & film, drywall & acoustics, flooring, tile, painting & wallcovering, toilet accessories, fire extinguishers, appliances, window shades, sprinkler, plumbing, HVAC, and electric
Bid Date:
9/4/2025 @ 2:00 pm
Estimated Start Date:
October 2025
Estimator:
David Bowers
Fairfax, VA
5,097 SF tenant fit out located in Fairfax, VA
– Deck height is 14′-6″
– Fire alarm tie in vendor – Adcock
– EMS controls – Emcor 301-340-2290
***Samaha requests that bidders utilize the contacts for products noted on the drawings, specifically on A6.01, as vendors have offered discounted pricing for industry professionals
– Provide VE suggestions with your bid
– Provide long lead time durations with your bid
Ashburn, VA
Full fit out of One Loudoun Building 6 (Pottery Barn). It is a freestanding building within the One Loudoun Development.
Bid Date:
9/10/2025 @ 3:00 pm
Estimated Start Date:
December 2025
Estimator:
Cyrus Bahadori
Fairfax, VA
Replace generator at 8401 Arlington Blvd, Fairfax, VA 22031
PREFERRED GENERATOR MANUFACTURER
OTHER ACCEPTABLE GENERATOR MANUFACTURES
· KOHLR
Caterpillar
REQUIRED SUB-CONTRACTORS:
Fire Alarm and BAS Tie In:
Richmond, VA
LF Jennings is requesting pricing for the Interior and Exterior Improvements for the Richmond Jet Center. The Project consists of 6,542 GSF of interior improvements. Interior improvements consist of millwork countertops and cabinets, storefront / curtain wall replacement, doors and hardware, painting, and flooring. Exterior improvements to include metal cladding siding, fencing & gates, starpro putting green, monument sign and masonry wall.
RFI’s Due: August 22nd, 2:00 PM
Proposals Due: September 10th, 12:00 Noon
Projected Construction Start: October 2025 [90 day Schedule]
Project consists of the following trades:
Select Demolition
Landscaping
StarPro Putting Green
Site Concrete
Asphalt Ramp
Fencing & Gates
Monument Sign
Masonry
Misc Metals – Bollards
Millwork Countertops and Cabinets
Laminate Countertops
Corrugated Metal Cladding
Storefront / Curtain Wall
Window Film
Door and Hardware
Painting
VCT and LVT Flooring
Carpet
Ceramic Tile
Framing, Sheetrock
Acoustical Ceilings
Vinyl Wallcovering
Toilet Partitions and Accessories
Signage
Roller Shades
Appliances
Plumbing Fixtures at Break Room
Electrical Lighting
Access Control
Bid Date:
9/10/2025 @ 12:00 pm
Estimated Start Date:
October 2025
Estimator:
Robert Augst
Reston, VA
The Project is comprised of a new restroom build out approximately 660 GSF of the shell space in the One Freedom Square space (the “Building) located at 11921 Freedom Drive, Reston, VA 20190. The Project includes all interior work for the restrooms as well as building façade work. Please note the construction is located on the ground floor of a fully functional hotel.
Falls Church, VA
L.F. Jennings is bidding a wood framed clubhouse in Falls Church, Virginia. The scope includes the demolition of an existing 6,304 SF building and pool. The scope also includes services for the buildout of 12,403 SF of space.
We are looking for bids by Wednesday, 8/27 by 2:00 PM
Below are the trade assignments – please coordinate with the estimator assigned to your trade.
Attie-Lee Craig – 703.531.2327, acraig@lfjennings.com
Mine Yalcin – 703.531.2358, myalcin@lfjennings.com
Annapolis, MD
L.F. Jennings is requesting pricing for the renovation/ modification of an existing Whole Foods Market. The renovation includes changes to the equipment layout while updating the equipment and finishes. The store will remain open while the renovations occur.
Project construction is scheduled to start January 2026.
Bid Date:
8/25/2025 @ 5:00 pm
Estimated Start Date:
January 2026
Estimator:
Bridget Lucidi
Virginia Beach, VA
The project consists of a renovation of an existing Target (125,275 +/-) located in Virginia Beach, VA. The existing store must remain operational during construction, and night work will be required for many trades.
The following trades are required: Asphalt Re-paving, Selective Demolition, Building Concrete, Polished Concrete, Masonry Patching, Metal Fabrications, Rough Carpentry, Composite Fabrications, Insulation, Membrane Roofing, Caulking, Doors, Frames, & Hardware, Light-Gauge Metal Framing & Drywall, Carpet Tile & Resilient Flooring, Luxury Vinyl Tile Flooring, Ceramic Tile, Acoustical Ceiling Tile & Grid, Painting & Wallcoverings, Toilet & Bath Accessories, Lockers, Loading Dock Equipment, Roller Window Shades, Fire Sprinklers, Plumbing, HVAC, Refrigeration, and Electrical & Fire Alarm.
Bids are due by Tuesday, September 9th, 2025 @ 2:00 PM.
© Copyright 2025 L.F. Jennings Inc.