Lorton, VA
L.F. Jennings is bidding on the new construction of a 143,000 SF tilt-wall warehouse and associated sitework. Sitework includes clearing, grading, wet utilities, paving, striping, C&G, landscaping and site lighting. Deep foundation system for support of the building and truck pads consists of precast driven piles. A methane mitigation system is incorporated into the building. Building construction includes concrete, structural steel, miscellaneous metals, light gauge metal framing, TPO roofing, caulking, doors/frames/hardware, overhead doors, finishes, dock equipment, HVAC, plumbing, fire protection (ESFR with fire pump), and electrical trades.

