Durham, NC
The Durham 85 Building 3 project is a 249,600 SF warehouse building. The building will consist of a structural steel framing with load bearing concrete wall panels, storefront entrances, mechanically fastened TPO membrane roof, dock doors, overhead doors, loading dock ramps and loading dock equipment. The interior space will consist of (4) demised tenant spaces, under-slab plumbing, a fire pump room and main electrical room.
Please be sure to review the Shell Narrative included in the “Plans” folder.
NOTE: Scope sheets to be issued under separate cover.
Please confirm bidding status by EOB Thursday 05-12-2022.