Fredericksburg, VA
Project consists of the renovation of over 3,170 sf of space including site work. The project requires night work/off hours work and there are several phases to the project. Scope of work to include, but not be limited to, the following trades. Demolition, site concrete & concrete pads, concrete trench pourbacks, fencing, asphalt paving & sealing, landscaping, masonry, steel & misc. metal, millwork, roofing, doors/frames/hardware, OH doors, glass & film, Environamics Symbio Glass Wall System, drywall & acoustics, flooring, tile, painting & wallcovering, toilet accessories, Fire extinguishers & brackets, appliances, window treatments, plumbing, HVAC, and electric.
- Walk-thru: Not available
- Site photos & deck height will be provided.
- Estimated Start Date: December 1, 2025
- Controls: Stand-Alone
- Please take note of the owner furnished items and contractor furnished items.
- There are several items that are to be purchased through NFCU’s vendor HCJ – info on the cover sheet of plans. Please pay attention to the fixture, equipment, finish schedules for these items. (Light fixtures, plumbing fixtures, accessories, floor finishes, wood ceiling, FRP, Corner Guards, Door Hardware, etc.)
Bid Date:
10/23/2025 @ 12:00 pm
Estimated Start Date:
December 2025
Estimator:
David Bowers