Greenville, NC
ECU Fleming Hall consists of renovations to existing restrooms on the first and second floors. Scopes will include selective demolition, floors, finishes, fixtures and equipment. Scopes include upgrades to the mechanical, electrical, plumbing, and fire protection systems in support of the renovation work. Hazardous abatement will be required in certain areas. A full report is included with the bid documents. Utility and sitework include connection to an existing chiller in an adjacent building yard, connection to existing sprinkler lines in previously renovated spaces, and replacement of building drain lines and manhole. Other work as indicated in bid documents.