 |
The following jobs are currently
out for sub bid:
If you are interested in bidding,
email the estimating department by clicking
here. Please include both the project name and the estimator's
name in the subject line. Also, fill out our qualification
questionnaire and submit either by mail or fax.
LA Fitness - Quince Orchard
Gaithersburg, Maryland
New construction of 45,000 square foot 2-story building and interior fitout of LA Fitness Facility. Includes, but not limited to, masonry, light gauge, steel, interior finishes, athletic flooring, swimming pool, sauna, elevators, MEP and sprinkler work.
Bid Date:
2/3/2012
Estimated Start
Date: 4/1/2012
Estimator:
Erick Nearpass
Harris Teeter Virginia Beach #161
Virginia Beach, Virginia
70,000 square foot Harris Teeter store. Complete remodel, new exterior faade (masonry, EIFS, LGMF, steel), metal/membrane roofing, concrete, miscellaneous metals, millwork, dampproofing, caulking, doors, glass and glazing, storefront, drywall, tile, carpet, VCT, epoxy floor, painting, partitions, plumbing, fire protection, HVAC and electrical.
Bid Date:
2/6/2012
Estimated Start
Date: 4/1/2012
Estimator:
Tom Kirby
Cubic Applications
Kingstowne, Virginia
11,546 square foot tenant fitout in Kingstowne, Virginia.
Bid Date:
2/6/2012
Estimated Start
Date: 4/1/2012
Estimator:
Jeff Black
Savers Store #1181
Woodbridge, Virginia
This project is a tenant fit-out of an existing 29,833 sf space. Bidding trades include: concrete, masonry, misc. metals, stainless steel, rough carpentry, millwork, insulation, caulking, doors, frames and hardware, storefront, light gage framing, drywall, ACT, FRP, VCT, vinyl base, floor sealer, painting, toilet accessories, toilet partitions, sprinkler, plumbing, HVAC, and electrical.
Bid Date:
2/10/2012
Estimated Start
Date: 4/1/2012
Estimator:
Wesley Meacombs
Clarksburg Village
Clarksburg, Maryland
Four (4) buildings and hardscaping package at Clarksburg Village Phase III in Clarksburg, MD. Four buildings total 34,777 SF (Bld B = 6,620 SF, Bld C = 14,065 SF, Bld E = 7,535 SF, and Bld F = 6,357 SF). One building (Building C) will be LEED Certified. Bidding trades include: site utilities, site electric, site concrete, site concrete staining, site specialties, site fencing/gates/rails, concrete, masonry (block, cmu, brick, precast, el dorado stone), structural steel, misc. metals, rough carpentry, insulation, EIFS, roofing (TPO and metal), caulking, doors, frames and hardware, storefront, light gage framing, drywall (sheathing), exterior paint, awnings, sprinkler, plumbing, HVAC (electric unit heaters only) and electrical (building and site).
Bid Date:
2/13/2012
Estimated Start
Date: 4/1/2012
Estimator:
Wesley Meacombs
Century Corner Professional Building III - Goose Creek
Ashburn, Virginia
3-story office building, 30,000 square feet core and shell, 3,600 square feet tenant buildout. Structural steel, misc metals, glass railings, millwork, TPO roof, EIFS, brick veneer, doors, curtainwall, LGMF, drywall, tile, resilient/carpet, paint, toilet partitions, awnings, mailboxes, HVAC (split system), plumbing, fire protection sprinkler, electrical, security, hydraulic elevator.
Bid Date:
2/15/2012
Estimated Start
Date: 4/1/2012
Estimator:
Tom Kirby
Corner at Short Pump - Building #6
Richmond, Virginia
Construction of a new 6,000 square foot retail building at Corner at Short Pump in Richmond, Virginia.
Bid Date:
2/15/2012
Estimated Start
Date: 4/1/2012
Estimator:
Jae Kai
Safeway Store #1019
Alexandria, Virginia
Site utilities (minor), select demolition of front of existing Safeway store and a portion of existing retail building, interior demolition of the existing store (also included removing 90% of existing slab on grade), new partitions, interior finishes, elevator, and MEP. All trades are needed. Building is approximately 44,000 square feet.
Bid Date:
2/21/2012
Estimated Start
Date: 4/1/2012
Estimator:
Scott Harleman
Clarksburg Village Phase III
Clarksburg, Maryland
Four (4) buildings and hardscaping package at Clarksburg Village Phase III in Clarksburg, MD. Four buildings total 34,777 SF (Bld B = 6,620 SF, Bld C = 14,065 SF, Bld E = 7,535 SF, and Bld F = 6,357 SF). One building (Building C) will be LEED Certified. Bidding trades include: site utilities, site electric, site concrete, site concrete staining, site specialties, site fencing/gates/rails, concrete, masonry (block, cmu, brick, precast, el dorado stone), structural steel, misc. metals, rough carpentry, insulation, EIFS, roofing (TPO and metal), caulking, doors, frames and hardware, storefront, light gage framing, drywall (sheathing), exterior paint, awnings, sprinkler, plumbing, HVAC (electric unit heaters only) and electrical (building and site).
Bid Date:
2/13/2012
Estimated Start
Date: 2/1/2012
Estimator:
Wesley Meacombs
Please fill out the
qualification questionnaire completely and fax to 703-241-5846,
or mail to:
L.F. Jennings, Inc. 407 N.
Washington St., Suite 200 Falls Church, VA 22046
|
 |